Solving a Bounded Maximisation LPP Graphically (Worked Example)
On this page· 13 sections
Source & scope. Class 12 Mathematics, Chapter 12 Linear Programming, Section 12.2.2, Example 1. Builds on: Corner Point Method: Step-by-Step Algorithm, Theorem 2: A Bounded Feasible Region Always Has Both a Maximum and Minimum. Next: Solving a Bounded Minimisation LPP Graphically (Worked Example), t...
Source & scope. Class 12 Mathematics, Chapter 12 Linear Programming, Section 12.2.2, Example 1. Builds on: Corner Point Method: Step-by-Step Algorithm, Theorem 2: A Bounded Feasible Region Always Has Both a Maximum and Minimum. Next: Solving a Bounded Minimisation LPP Graphically (Worked Example), the complementary minimisation case.
This worked example solves NCERT's Example 1 — Maximise Z = 4x + y subject to x + y ≤ 50, 3x + y ≤ 90, x ≥ 0, y ≥ 0 — by the Corner Point Method, finding a bounded feasible region with four corner points and a maximum value of Z = 120 at (30, 0). NCERT introduces this as the chapter's first fully worked application of the Corner Point Method, immediately after stating Theorem 1 and Theorem 2.
At a glance
- Problem: Maximise Z = 4x + y s.t. x+y≤50, 3x+y≤90, x,y≥0.
- Feasible region is the bounded quadrilateral OABC.
- Corner points: O(0,0), A(30,0), B(20,30), C(0,50).
- Z-values: 0, 120, 110, 50 respectively.
- Maximum Z = 120, attained at (30, 0).
Learning objectives
- Reproduce NCERT's Example 1 solution in full, step by step.
- Correctly find all four corner points of the feasible region, by inspection and by solving simultaneous equations.
- Apply the bounded-region shortcut (Theorem 2) to confirm the maximum without further testing.
- Recognise this as a template for any bounded two-constraint maximisation LPP.
Prerequisite knowledge
The reader should already understand the Corner Point Method's steps and know that a bounded region's largest corner-point value is immediately the maximum (Theorem 2) — see the dedicated sibling articles — before working through this specific numerical example.
Core explanation
The problem. NCERT's Example 1 states: "Solve the following linear programming problem graphically: Maximise Z = 4x + y subject to the constraints: x + y ≤ 50, 3x + y ≤ 90, x ≥ 0, y ≥ 0." This is a straightforward two-constraint maximisation problem, serving as the Corner Point Method's first full demonstration.
Step 1 — graph the constraints and find the feasible region. The line x + y = 50 passes through (50,0) and (0,50); shade the side containing the origin (since 0+0=0≤50). The line 3x + y = 90 passes through (30,0) and (0,90); shade the side containing the origin (since 3(0)+0=0≤90). Restricting to the first quadrant (x,y≥0), the region common to all constraints is the bounded quadrilateral NCERT labels OABC.
Step 2 — find the corner points. O(0,0) is the origin, always a corner point here. On the x-axis (y=0): from x+y≤50, x≤50; from 3x+y≤90, x≤30 — the binding (tighter) limit is x≤30, so A is (30,0). On the y-axis (x=0): from x+y≤50, y≤50; from 3x+y≤90, y≤90 — the binding limit is y≤50, so C is (0,50). The fourth corner, B, is where x+y=50 and 3x+y=90 intersect: subtracting the first from the second gives 2x=40, so x=20, and then y=50−20=30, giving B(20,30).
Step 3 — evaluate Z = 4x + y at each corner point. Z(O) = 4(0)+0 = 0. Z(A) = 4(30)+0 = 120. Z(B) = 4(20)+30 = 80+30 = 110. Z(C) = 4(0)+50 = 50.
Step 4 — apply the bounded-region conclusion. The feasible region OABC is a closed quadrilateral, hence bounded. By Theorem 2, the largest of the corner-point values, M = 120 (at A), is immediately confirmed as the true maximum value of Z over the entire feasible region — no half-plane test is required (that extra step is needed only for unbounded regions, see the dedicated sibling articles). NCERT concludes: "Hence, maximum value of Z is 120 at the point (30, 0)."
Key terms
- Bounded quadrilateral OABC — the feasible region of this specific example.
- Binding constraint — whichever constraint gives the tighter (smaller, for a ≤ constraint) limit at a given axis, determining the actual corner point there.
- M — the largest Z-value found among the corner points, confirmed as the maximum since the region is bounded.
Diagram / figure guidance
Plot the first quadrant with the lines x+y=50 (through (50,0) and (0,50)) and 3x+y=90 (through (30,0) and (0,90)), shade the overlapping bounded quadrilateral OABC, and label each corner with its coordinates and Z-value: O(0,0)→0, A(30,0)→120, B(20,30)→110, C(0,50)→50, with A starred as the maximum.
Worked example
Confirm that A(30,0), not C(0,50) or B(20,30), gives the maximum value of Z = 4x + y over the feasible region OABC.
Compare all four computed values directly: Z(O)=0, Z(A)=120, Z(B)=110, Z(C)=50. Scanning this list, 120 is clearly the largest, exceeding both 110 (at B) and 50 (at C). Since Theorem 2 applies (the region is bounded), this largest value is guaranteed to be the true maximum over the whole region, not merely the largest among the four sampled corners by luck — no other point in OABC, whether on an edge or in the interior, can give a value of Z greater than 120. The maximum value of Z is therefore 120, attained specifically at A(30, 0).
Common misconceptions
- "The corner point farthest from the origin always gives the maximum." Here, C(0,50) is farther from the origin than A(30,0) (50 vs 30 units), yet A gives the larger Z-value (120 vs 50) — the maximum depends on the objective function's coefficients, not simple distance.
- "Both constraints must be checked to find each corner point." Only the BINDING constraint at each axis determines that axis's corner point (e.g., A comes from 3x+y=90 alone, since it is tighter than x+y=50 on the x-axis) — the non-binding constraint is still satisfied there, just not the one defining the boundary.
- "Since this is a maximisation problem, the minimum value of Z doesn't matter." Although the problem only asks for the maximum, Theorem 2 guarantees a minimum exists too (it would be Z=0, at O) — the problem statement simply doesn't ask for it here.
- "The feasible region must be a triangle for the Corner Point Method to apply." The method works for feasible regions of any number of sides (quadrilaterals, pentagons, etc.), not just triangles; this example happens to produce a quadrilateral.
Exam application (JEE)
This exact problem type — two linear constraints plus non-negativity, producing a bounded quadrilateral — is the single most common graphical LPP structure tested on JEE. Students are expected to reliably identify which constraint is "binding" at each axis intercept (as shown in Step 2) without extra algebra, since this speeds up corner-point identification considerably.
Frequently asked questions
- What is the maximum value of Z = 4x + y subject to x+y≤50, 3x+y≤90, x,y≥0? The maximum value is 120, attained at the point (30, 0).
- What are the corner points of this feasible region? O(0,0), A(30,0), B(20,30), and C(0,50).
- Why is no half-plane test needed in this example? Because the feasible region is bounded, so Theorem 2 directly guarantees the largest corner-point value is the true maximum.
- How is corner point B(20,30) found? By solving the two boundary equations x+y=50 and 3x+y=90 simultaneously.
- Does this problem also have a minimum value of Z? Yes — Theorem 2 guarantees a minimum exists too (Z=0, at the origin), though the problem as stated only asks for the maximum.
Practice questions (original practice questions)
- The maximum value of Z = 4x + y in this example is attained at:
- (a) O(0,0)
- (b) A(30,0)
- (c) B(20,30)
- (d) C(0,50)
- Answer: (b) — Z = 120 at A, the largest among all corner points.
- Corner point A(30,0) is found using which constraint?
- (a) x + y ≤ 50 only
- (b) 3x + y ≤ 90 only
- (c) Both constraints equally
- (d) Neither constraint
- Answer: (b) — 3x+y=90 is the binding constraint on the x-axis, giving x=30.
- The value of Z at corner point C(0,50) is:
- (a) 120
- (b) 110
- (c) 50
- (d) 0
- Answer: (c) — Z(C) = 4(0)+50 = 50.
- Why is Theorem 2 directly applicable in this example?
- (a) Because the region is unbounded
- (b) Because the region is bounded
- (c) Because there are no constraints
- (d) Because Z is non-linear
- Answer: (b) — OABC is a closed, bounded quadrilateral.
- What is the value of Z at corner point B(20,30)?
- (a) 110
- (b) 120
- (c) 50
- (d) 0
- Answer: (a) — Z(B) = 4(20)+30 = 80+30 = 110.
Quick revision
- Problem: Maximise Z = 4x + y s.t. x+y≤50, 3x+y≤90, x,y≥0.
- Corner points: O(0,0), A(30,0), B(20,30), C(0,50).
- Z-values: 0, 120, 110, 50.
- Feasible region is bounded, so Theorem 2 applies directly — no half-plane test needed.
- Maximum Z = 120 at (30, 0).
Related articles
- Builds on: Corner Point Method: Step-by-Step Algorithm
- Next: Solving a Bounded Minimisation LPP Graphically (Worked Example)
- See also: Theorem 2: A Bounded Feasible Region Always Has Both a Maximum and Minimum, The Furniture Dealer Problem (NCERT's Introductory LPP Example)
- Related topics: Bounded Feasible Region in Linear Programming, Constraints and Non-Negative Restrictions in Linear Programming, Convexity of the Feasible Region in Linear Programming, Corner Point (Vertex) of a Feasible Region, Decision Variables in Linear Programming, Feasible Region of a Linear Programming Problem